LINSON OIL engineers and supplies project-specific skid-mounted process packages that integrate process equipment, piping, valves, instruments, electrical/control interfaces, structural framing, inspection and documentation within a defined package boundary.

The skid concept is developed from Process Data, P&ID, Data Sheets, Technical Specifications, battery limits, transport/site restrictions and inspection requirements. Skid dimensions, weight, prefabrication ratio, delivery time, field-installation time, Ex/IP ratings and standard configuration are not universal values.

A process skid is an engineered package boundary—not only equipment placed on a steel frame.

Process Basis

Define the process duty before defining the skid.

A modular package should preserve the process intent while making the equipment boundary practical for fabrication, inspection, transport and field connection.

Process Data

Flow, composition, pressure, temperature, operating cases, utilities and required process outcome.

P&ID / Equipment List

Equipment tags, line/valve/instrument scope, control functions, relief/drain interfaces and customer tie-ins.

Project Specification

Codes, client requirements, materials, hazardous-area basis if specified, inspection, documentation and approved vendor requirements.

Site / Logistics Basis

Plot space, road/port limits, lifting, installation sequence, maintenance access, destination and field-construction boundaries.

Package Boundary

Make every included item and every field interface explicit.

A clear skid boundary reduces procurement gaps between process equipment, piping, valves, instrumentation, structural steel, electrical/control items, documentation and field tie-ins.

01 / INSIDE

Package Equipment

Define vessels, filters, heaters, pumps, exchangers, dosing equipment or other process items included within the package.

02 / CONNECT

Piping / Valve Interfaces

Identify package piping, valves, drains/vents, relief connections and field tie-in points from the approved P&ID.

03 / CONTROL

Instrument / Electrical Scope

Clarify instruments, junction/interface points, control functions, power/signal requirements and customer-system boundary.

04 / FIELD

Site Responsibilities

Define foundations, utility supply, inter-skid piping/cabling, final field joints, lifting, erection, commissioning and customer-supplied items.

Equipment / Piping / Valve / Instrument Integration

Coordinate the package as an operating system, not a list of components.

LINSON OIL's documented manufacturing resources include pressure-vessel fabrication, pipe prefabrication, skid assembly and valve/instrument/electrical/control-system integration. Engineering scope also includes pressure-vessel, piping, skid, electrical, instrumentation and control design.

Mechanical Equipment

Confirm equipment orientation, maintenance clearances, support loads, nozzles and lifting/assembly requirements.

Piping & Valves

Coordinate piping class, routing, supports, valves, drains/vents, relief paths and accessible operation/maintenance positions.

Instrumentation & Control

Map each instrument/control function to the P&ID, equipment nozzle/tapping and agreed control-system boundary.

Structure / Access

Develop the frame, platforms, ladders/access, lifting points and shipment splits around equipment and site constraints.

Modularization & Transport

Break the process into modules only after checking transport and site constraints.

He50 project evidence directly supports a skid-mounted design philosophy emphasizing modularization, transport convenience, rapid installation, flexible relocation and factory prefabrication. Those principles are useful, but the shipment split and degree of prefabrication remain project-specific.

  1. 01 / LIMITS

    Transport Envelope

    Check road, port, container/breakbulk, lifting and destination constraints before finalizing module size and shipment splits.

  2. 02 / SPLIT

    Module / Shipment Split

    Separate modules at practical piping, structural, electrical and control interfaces while preserving field assembly logic.

  3. 03 / PREBUILD

    Factory Preassembly

    Preassemble and inspect as much of the agreed package as practical before shipment, without claiming a fixed prefabrication percentage.

  4. 04 / REJOIN

    Field Reconnection

    Identify field welds/joints, inter-skid piping, cables, supports and commissioning responsibilities in advance.

Interface Management

Control the interfaces between package, plant and site construction.

Typical skid-package interface-management topics
Interface Clarify Deliverable / Control
ProcessFeed/product conditions, utility users, relief/drain destinations, package battery limits.P&ID, process/data sheets, tie-in list and assumptions.
Mechanical / PipingNozzles, flanges, piping class, field joints, supports, loads and access.GA, piping layouts/isometrics where applicable, interface schedule.
Electrical / ControlPower, signals, package/local control, customer DCS/PLC boundary and cable/interface responsibility.I/O/interface lists, wiring/control documents as included.
Civil / Site / LogisticsFoundation, anchors, lifting, transport, erection space and installation sequence.Loads/interface data, lifting/shipment information and installation guidance.

FAT / Documentation

Verify the package against the approved project basis before shipment.

LINSON OIL's quality scope supports material verification/traceability, dimensional inspection, applicable NDT, pressure/leak testing where required, complete-assembly inspection, instrument/electrical/control testing and FAT according to project specification and ITP.

Mechanical Completion

Verify equipment, piping, valves, supports, labels/access and agreed assembly scope before release.

Pressure / Leak / Functional Tests

Apply project-specified pressure, leak, instrument/electrical/control and functional checks where applicable.

Customer / TPI Witness

Coordinate customer, EPC or third-party inspection and witness points according to the approved ITP.

Final Documentation

Compile approved drawings, material/NDT/test/FAT records, manuals, certificates and packing/shipping documents as required.

Site Installation / Commissioning

Plan field execution before the skid leaves the factory.

LINSON OIL's documented support extends from engineering and FAT through export delivery, installation guidance, commissioning, spare parts and after-sales service. Exact field scope is contract-defined.

Site Readiness

Foundation, access, cranes/lifting, utilities, field materials and customer interfaces.

Reassembly / Tie-Ins

Module positioning, field joints, piping/cabling, supports and inter-skid connections as applicable.

Pre-Commissioning

Inspection, cleaning/checks, instrument/electrical verification and readiness review according to scope.

Commissioning / Handover

Support operating checks, documentation handover, spares/training or after-sales requirements where contracted.

Engineering Inputs

A good skid RFQ defines both process duty and package interfaces.

When information is incomplete, the engineering review should identify the clarification points that materially affect process selection, layout, interfaces, transport and quotation.

Process Basis

Process Data, feed/product conditions, operating cases, required duty and utility availability.

Package Documents

P&ID, Equipment List, Data Sheets, line/instrument lists, control philosophy and Technical Specification.

Interface / Site Data

Battery limits, tie-ins, plot/GA constraints, transport/lifting limits, foundation/site interfaces and destination.

Quality / Delivery Basis

Applicable codes/project requirements, ITP, FAT/TPI, documentation, packing, commissioning and service scope.

Project Evidence

Evidence spans separation, dehydration, stabilization and associated-gas process packages.

Representative sources include the He50 three-phase separator skid, Shunbei molecular-sieve dehydration skid, Longfengshan condensate stabilization skid and Congo associated-gas / NGL / LNG project. Xilong's certified management-system scope also directly includes skid-mounted equipment, metering equipment, instrument-air skids and multiple process-equipment families.

Evidence Boundary

Project-specific skid dimensions, weight, throughput, shipment split, prefabrication percentage, delivery period, installation duration, control hardware, Ex/IP ratings or performance figures remain tied to their original project or equipment basis.

Package Types Supported by Evidence

Separation / Metering

He50 and related separation-skid evidence supports modular separation and metering-oriented package supply.

Gas Treatment

Molecular-sieve dehydration and broader gas-processing resources support packaged gas-treatment integration.

Custom Utility / Process Skids

Instrument-air, chemical-injection, heating and other custom package families are handled from their exact project basis.

Solution RFQ

Send the process basis and package boundary.

Share Process Data, P&ID, Equipment List, Data Sheets, Technical Specification, battery limits, utilities, transport/site restrictions, inspection/FAT requirements and delivery destination.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

[email protected]
WhatsApp: +86 185 6293 6333
Dongying, Shandong, China

By submitting, you authorize LINSON OIL to contact you regarding this technical inquiry.

Submitting your RFQ...
WhatsApp