LINSON OIL supplies project-configured metering and separation skids for oil and gas production, well testing, gathering and field-transfer duties. Two-phase or three-phase separation, metering method, manifolds, piping, valves, instruments, controls and optional heating or auxiliary functions are defined from the actual fluid data, operating cases and project scope.
- Separation
- 2-Phase / 3-Phase
- Metering
- Project Selected
- Integration
- Piping · I&C · Skid
- Inspection
- FAT by Project
Integrated Field Package
Separator, metering, piping, valves, instruments and controls are coordinated to the approved process basis and battery limits.
Process Logic
Separate the wellstream, measure the required streams and route them to the next process step.
The skid is not defined by one standard P&ID. Phase count, separator type, metering arrangement, inlet/outlet manifolds, heating, sand handling, instruments and control philosophy depend on the fluid condition and project requirement.
-
01 / INLET
Receive & Control the Feed
Define inlet piping, isolation, choke/control interfaces, manifold routing and protection around the operating philosophy.
-
02 / SEPARATE
Separate Required Phases
Use two-phase or three-phase separation as required, with project-specific internals, liquid control and solids/sand considerations.
-
03 / METER
Measure Process Streams
Select flow measurement, pressure/temperature/level instrumentation, sampling and reporting interfaces to the required duty.
-
04 / TRANSFER
Route & Control Outputs
Coordinate oil, gas and water outlets, export piping, controls, shutdown interfaces and downstream tie-ins within the package scope.
Applications
Configured for production, testing, gathering and transfer duties.
A metering and separation skid is an integrated process package; it should not be presented as a universal combination of every optional oilfield function.
Production Separation & Metering
Continuous field-production duties requiring phase separation and measurement before export or further treatment.
Well Test / Allocation Duty
Project-defined test or allocation arrangements where individual wellstream separation and measurement are required.
Gathering Station Packages
Integrated separator, metering, manifold and control functions at collection or gathering facilities.
Modular Field Facilities
Factory-preassembled skid packages where transport, installation, lifting and site work are important project constraints.
Configuration & Supply Boundary
Coordinate separator, metering and skid integration as one package.
The exact equipment list follows the approved P&ID. Optional functions remain optional unless the process basis requires them.
Separator & Internals
Two-phase or three-phase separator, project-specific internals, mist elimination, liquid sections and level-control interfaces.
Metering & Instrumentation
Flow measurement, pressure, temperature, level, sampling and data/reporting interfaces selected for the required duty.
Manifolds, Valves & Piping
Inlet, bypass, test/production, phase outlet, drain and vent routing coordinated to the approved process scheme.
Controls & Shutdown Interfaces
Local instruments, control panels, alarms, permissives, shutdown signals and remote interfaces according to project philosophy.
Optional Process Functions
Heating, sand handling, chemical injection, filtration or other functions are included only when required by the operating condition and scope.
Skid & Structural Integration
Base frame, supports, access, lifting, preassembly and transport considerations are coordinated to the site and delivery plan.
Engineering Inputs
Define the fluid, operating envelope and metering objective first.
Where the project basis is incomplete, send the available Process Data, P&ID or wellstream information. The missing points can be clarified before a final package configuration is proposed.
Wellstream / Fluid Data
Oil/gas/water rates, water cut, gas-oil ratio, density/viscosity, solids or sand and phase behavior where available.
Operating Conditions
Normal/min/max flow cases, operating/design pressure and temperature, turndown or test cases and upstream variation.
Metering & Control Basis
Required measured streams, metering method if specified, sampling/reporting needs, control philosophy and communication interfaces.
Project & Site Interfaces
P&ID, Data Sheet, Technical Specification, materials/corrosion basis, hazardous-area requirements, utilities, plot and transport limits.
Manufacturing & FAT
Factory integration supports a more controlled skid delivery.
Applicable vessel fabrication, piping prefabrication, skid assembly, valve/instrument installation and control integration are coordinated to the approved project scope. Inspection and FAT follow the project specification and ITP.
Engineering Release
Approved P&ID, equipment data, drawings, materials and inspection points are coordinated before fabrication.
Fabrication & Assembly
Separator, skid structure, piping, valves, instruments and related components are assembled to the confirmed supply boundary.
Inspection & Testing
Material, dimensional, applicable NDT, pressure/leak, instrument and functional checks are performed as required.
FAT & Records
FAT, customer/EPC/third-party witness support and quality records are arranged where included in the agreed scope.
Related Equipment
Build the skid around the required separator and field interfaces.
Three-Phase Separator
Oil/gas/water separation for production duties where three phases must be handled independently.
View Equipment →Metering & Test Separator
Well-test and production measurement duties requiring dedicated separator selection.
View Equipment →Gas-Liquid Separator
Two-phase gas/liquid separation where the process requires this service.
View Equipment →Wellhead Heater
Project-specific heating duty where fluid temperature requires upstream or integrated heating.
View Equipment →Related Solutions & Project
Connect the product page to separation, gathering and project evidence.
Solution
Oil, Gas & Water Separation / Metering
Review the broader production-separation and metering objective across the field process.
Solution
Crude Oil Heating, Gathering & Separation
Connect separation and metering with heating and gathering requirements where the process calls for them.
Solution
Modular Skid Process Packages
Coordinate equipment, piping, instrumentation and controls within a defined skid boundary.
Project Reference
He50 Three-Phase Separator Skid
Documented skid project in which water-bearing crude is separated into oil, gas and water, then individually metered and exported.
Metering & Separation RFQ
Send the wellstream data, required phases and metering objective.
Share available Process Data, P&ID, Data Sheet, Technical Specification, wellstream composition and required scope. We will review the process basis before defining the separator, metering arrangement and skid boundary.
Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.