LINSON OIL

Oilfield Separation · Metering · Integrated Skid

Metering & Separation Skid

LINSON OIL supplies project-configured metering and separation skids for oil and gas production, well testing, gathering and field-transfer duties. Two-phase or three-phase separation, metering method, manifolds, piping, valves, instruments, controls and optional heating or auxiliary functions are defined from the actual fluid data, operating cases and project scope.

Separation
2-Phase / 3-Phase
Metering
Project Selected
Integration
Piping · I&C · Skid
Inspection
FAT by Project

Integrated Field Package

Separator, metering, piping, valves, instruments and controls are coordinated to the approved process basis and battery limits.

Process Logic

Separate the wellstream, measure the required streams and route them to the next process step.

The skid is not defined by one standard P&ID. Phase count, separator type, metering arrangement, inlet/outlet manifolds, heating, sand handling, instruments and control philosophy depend on the fluid condition and project requirement.

  1. 01 / INLET

    Receive & Control the Feed

    Define inlet piping, isolation, choke/control interfaces, manifold routing and protection around the operating philosophy.

  2. 02 / SEPARATE

    Separate Required Phases

    Use two-phase or three-phase separation as required, with project-specific internals, liquid control and solids/sand considerations.

  3. 03 / METER

    Measure Process Streams

    Select flow measurement, pressure/temperature/level instrumentation, sampling and reporting interfaces to the required duty.

  4. 04 / TRANSFER

    Route & Control Outputs

    Coordinate oil, gas and water outlets, export piping, controls, shutdown interfaces and downstream tie-ins within the package scope.

Applications

Configured for production, testing, gathering and transfer duties.

A metering and separation skid is an integrated process package; it should not be presented as a universal combination of every optional oilfield function.

01

Production Separation & Metering

Continuous field-production duties requiring phase separation and measurement before export or further treatment.

02

Well Test / Allocation Duty

Project-defined test or allocation arrangements where individual wellstream separation and measurement are required.

03

Gathering Station Packages

Integrated separator, metering, manifold and control functions at collection or gathering facilities.

04

Modular Field Facilities

Factory-preassembled skid packages where transport, installation, lifting and site work are important project constraints.

Configuration & Supply Boundary

Coordinate separator, metering and skid integration as one package.

The exact equipment list follows the approved P&ID. Optional functions remain optional unless the process basis requires them.

Separator & Internals

Two-phase or three-phase separator, project-specific internals, mist elimination, liquid sections and level-control interfaces.

Metering & Instrumentation

Flow measurement, pressure, temperature, level, sampling and data/reporting interfaces selected for the required duty.

Manifolds, Valves & Piping

Inlet, bypass, test/production, phase outlet, drain and vent routing coordinated to the approved process scheme.

Controls & Shutdown Interfaces

Local instruments, control panels, alarms, permissives, shutdown signals and remote interfaces according to project philosophy.

Optional Process Functions

Heating, sand handling, chemical injection, filtration or other functions are included only when required by the operating condition and scope.

Skid & Structural Integration

Base frame, supports, access, lifting, preassembly and transport considerations are coordinated to the site and delivery plan.

Engineering Inputs

Define the fluid, operating envelope and metering objective first.

Where the project basis is incomplete, send the available Process Data, P&ID or wellstream information. The missing points can be clarified before a final package configuration is proposed.

Wellstream / Fluid Data

Oil/gas/water rates, water cut, gas-oil ratio, density/viscosity, solids or sand and phase behavior where available.

Operating Conditions

Normal/min/max flow cases, operating/design pressure and temperature, turndown or test cases and upstream variation.

Metering & Control Basis

Required measured streams, metering method if specified, sampling/reporting needs, control philosophy and communication interfaces.

Project & Site Interfaces

P&ID, Data Sheet, Technical Specification, materials/corrosion basis, hazardous-area requirements, utilities, plot and transport limits.

Manufacturing & FAT

Factory integration supports a more controlled skid delivery.

Applicable vessel fabrication, piping prefabrication, skid assembly, valve/instrument installation and control integration are coordinated to the approved project scope. Inspection and FAT follow the project specification and ITP.

01

Engineering Release

Approved P&ID, equipment data, drawings, materials and inspection points are coordinated before fabrication.

02

Fabrication & Assembly

Separator, skid structure, piping, valves, instruments and related components are assembled to the confirmed supply boundary.

03

Inspection & Testing

Material, dimensional, applicable NDT, pressure/leak, instrument and functional checks are performed as required.

04

FAT & Records

FAT, customer/EPC/third-party witness support and quality records are arranged where included in the agreed scope.

Metering & Separation RFQ

Send the wellstream data, required phases and metering objective.

Share available Process Data, P&ID, Data Sheet, Technical Specification, wellstream composition and required scope. We will review the process basis before defining the separator, metering arrangement and skid boundary.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

[email protected]
WhatsApp: +86 185 6293 6333
Dongying, Shandong, China

By submitting, you authorize LINSON OIL to contact you regarding this technical inquiry.