LINSON OIL

Project-Engineered Separation & Metering

Metering &
Test Separator

Project-based separation equipment for production testing, well testing and stable fluid conditioning before metering. Configured for gas-liquid or oil-gas-water separation according to process data, operating conditions and project requirements.

Separation duty, metering interfaces, controls, materials and package boundaries are confirmed from the actual project basis rather than assumed as fixed standard specifications.

Service Production / Well Test
Separation 2-Phase / 3-Phase
Arrangement Project-Specific
Delivery Unit / Skid Package

Core Functions

Separation before
measurement matters

The separator configuration is developed around the project process basis, required test duty, fluid behavior and metering arrangement.

Separation Duty

Gas-liquid separation or oil-gas-water separation as required for production, well test or process service.

Metering Conditions

Outlet conditions can be engineered to support the selected metering approach, flow path and operating requirements.

Control Integration

Level, pressure and flow-related instruments and controls can be integrated according to the defined scope of supply.

Solids Consideration

Sand, solids and fluid contaminants can be reviewed during engineering where applicable to the service conditions.

Test Flexibility

The package can be arranged for the required production or well test operating sequence and site workflow.

Project-Based Scope

Design, fabrication and documentation are aligned with confirmed process data, codes, interfaces and customer specifications.

Configuration & Supply Forms

Configured for the actual duty

Metering and test separator arrangements are selected after reviewing the separation duty, operating envelope, metering philosophy, installation space, controls and required project interfaces.

Metering & Separation Skid

IMG-02

A project package can integrate the separator with connected piping, valves, instruments, metering interfaces, supports and controls according to the confirmed scope.

  • Separation vessel
  • Metering interfaces
  • Piping & valves
  • Instrument / control scope

Project-Specific Test Package

IMG-03

Two-phase or three-phase separation duty, metering points, fluid routing and operating sequence are configured from the production or well-test basis rather than assumed from a fixed standard arrangement.

  • 2-phase / 3-phase duty
  • Production / well test
  • Metering requirements
  • Project interfaces

Engineering Inputs

Start with the process basis

A clear technical input package helps our engineering team develop the appropriate separation, control, metering and mechanical scope for your project.

Placeholder for process data and P and ID engineering review

Engineering review visual / IMG-04

Recommended RFQ Information

Fluid Flow Data

Oil, gas and water flow rates; operating and design cases.

Fluid Characteristics

Water cut, GOR, density, viscosity and composition where available.

Operating Conditions

Pressure, temperature, operating cycle and ambient or site conditions.

Corrosion Factors

H2S, CO2, produced water, salinity, sand, solids or other concerns.

Metering Requirement

Meter type, parameters, required interfaces and applicable project standard.

Project Requirements

P&ID, Data Sheet, technical specification, location and applicable code.

Incomplete Data? Start With What You Have.

Send available drawings, a preliminary process description or your application details. We can identify key technical clarification points before preparing the proposed scope.

Submit Available Documents

Engineering & Manufacturing Scope

From vessel fabrication to FAT

LINSON OIL supports project execution from technical clarification and engineering through manufacturing, assembly, inspection, testing, documentation and export delivery.

  1. 01

    Engineering & Scope Confirmation

    Review of process data, equipment configuration, mechanical design basis, P&ID interfaces and instrument requirements.

  2. 02

    Integrated Package Manufacturing

    Vessel fabrication, piping, supports, valves, instruments, metering interfaces and skid integration according to the agreed project scope.

  3. 03

    Inspection & Testing

    Applicable dimensional inspection, NDT, pressure testing, leak checks and assembly verification are performed according to project requirements.

  4. 04

    FAT & Documentation

    FAT support, customer or third-party inspection coordination, records and final documentation are arranged as defined by the project ITP and specification.

Placeholder for separator manufacturing and factory acceptance testing
Manufacturing & FAT ReferenceIMG-05

Request for Quotation

Send your technical documents

Upload available project information for an engineering review. P&ID, Process Data, Data Sheet, Technical Specification and metering requirements are all useful. Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

Direct Contact

Phone / WhatsApp
+86 18562936333
Manufacturing Base
Dongying, Shandong, China

Available Process Data

Complete what is available. Unknown items can be clarified during engineering review.

Upload P&ID, Process Data, Data Sheet, Technical Specification, metering requirement or other available reference documents.

Submit Available Information

Sending RFQ and documents...
WhatsApp