Project Reference · Shunbei No. 5 Joint Station · Gas Dehydration

Shunbei Molecular Sieve Dehydration Project

The Shunbei No. 5 Joint Station reference documents a molecular-sieve dehydration skid used as key natural-gas treatment equipment within the Shunbei field development. Direct source material identifies molecular-sieve dryers, a regeneration system, a gas dispersing/distribution component and an automated control system as core parts of the skid.

Application

Natural Gas Dehydration

Package

Molecular Sieve Skid

Evidence

Dryer · Regeneration · Control

Image pass: use the exact Shunbei project/skid source image and retain project attribution only where the source supports it.

Project Background

A dehydration skid within the Shunbei No. 5 Joint Station gas-treatment system.

The source identifies Shunbei No. 5 Joint Station as an important part of the Shunbei Oilfield Area 1 Ordovician reservoir capacity-development project. Within the station, the molecular-sieve dehydration skid is described as key natural-gas treatment equipment.

For website communication, this page uses the reference to demonstrate a real dehydration application and the verified process/equipment elements. It does not publish non-public contract values, operating guarantees or proprietary project documents.

Gas Dehydration Requirement

The verified project function is molecular-sieve gas dehydration.

The source describes the skid as using the adsorption characteristics of molecular sieve to remove water and trace impurities from natural gas. It does not provide a publishable universal capacity, outlet dew point, adsorption cycle, regeneration temperature or efficiency guarantee.

01

Feed Gas Basis

For a similar project, clarify gas composition, flow, inlet pressure/temperature, free liquids, solids and contaminants.

02

Outlet Requirement

Define the customer/downstream moisture or dew-point basis without assuming a value from this reference.

03

Regeneration Basis

Clarify regeneration philosophy, utility availability, off-gas handling and operating sequence for the new project.

04

Station Interface

Coordinate upstream conditioning, downstream gas-treatment interface, utilities, control and battery limits.

Scope of Supply · Evidence Boundary

Separate the verified project scope from LINSON OIL's broader integration capability.

The direct source verifies the dehydration skid and its core process/control elements. General LINSON OIL capability supports broader skid, piping, valve, instrument, electrical and documentation integration, but those items are not presented here as confirmed original Shunbei contract inclusions unless separately evidenced.

DIRECT PROJECT EVIDENCE

Molecular Sieve Dryers

Identified by the project source as a core component of the dehydration skid.

DIRECT PROJECT EVIDENCE

Regeneration System

Explicitly listed as a core part of the molecular-sieve dehydration skid.

DIRECT PROJECT EVIDENCE

Dispersing / Distribution Component

The Chinese project source identifies a “分散机构”; exact internal geometry should be verified from the original technical/project image set during the image pass.

DIRECT PROJECT EVIDENCE

Automated Control System

The project source directly identifies automatic/automated control as part of the skid system.

Molecular Sieve Process

Adsorption and regeneration form the verified process core.

The source describes efficient adsorption/regeneration and intelligent control as defining features of the skid. The page therefore explains the process logic without inventing the number of beds, cycle duration, regeneration temperature or switching sequence used in the original project.

  1. 01 / FEED

    Feed Gas Interface

    The new-project design confirms upstream separation/filtration needs, process conditions and piping/control battery limits before the dryer section.

  2. 02 / ADSORB

    Molecular Sieve Adsorption

    Gas contacts the selected molecular-sieve adsorption system to meet the confirmed project dehydration basis.

  3. 03 / REGENERATE

    Regeneration

    The regeneration system restores adsorption capacity according to the approved process and operating philosophy.

  4. 04 / CONTROL

    Automatic Sequence / Handover

    Control logic coordinates the process sequence and downstream dry-gas interface according to the new project's control narrative.

Dryer / Regeneration / Control Integration

A similar package should be engineered as a coordinated skid system.

LINSON OIL's general capability supports pressure-vessel, piping, skid, electrical, instrumentation and control design, plus pipe prefabrication, skid assembly and valve/instrument/electrical/control-system integration. This broader capability is used here to explain how a new project can be executed—not to enlarge the documented original Shunbei contract scope.

Dryer Mechanical Interface

Coordinate vessel/nozzle arrangement, internals interface, access, supports and inspection requirements.

Regeneration Package Interface

Define heating/cooling or regeneration-gas equipment, piping, valves and utilities from the approved process design.

Instrumentation / Control

Map instruments, alarms, switching/interlocks and package-control interfaces to the approved control philosophy.

Skid / Field Interface

Coordinate package structure, interconnecting piping, shipment split, field tie-ins and maintenance access.

Manufacturing & FAT

Project inspection should follow approved documents and the agreed ITP.

For new dehydration packages, LINSON OIL's quality resources support material verification/traceability, welding control, dimensional inspection, applicable NDT, pressure/leak testing where required, complete-assembly inspection, instrument/electrical/control testing and FAT.

Material / Fabrication Records

Material certificates, traceability, welding/fabrication and dimensional records as required.

Pressure Equipment / Piping Inspection

Applicable NDT, pressure/leak testing and assembly inspection according to the project basis.

Instrument / Control Tests

Instrument, electrical and control-system checks according to the approved package scope.

FAT / TPI / Customer Witness

FAT and witness points are defined by the customer/EPC specification and approved ITP.

Delivery / Site Interface

Define how the package connects to the station before shipment.

The original source does not publish the Shunbei delivery schedule or field installation duration. For new projects, transport, tie-ins and site support are confirmed from the actual package and contract scope.

Mechanical Tie-Ins

Confirm gas inlet/outlet, regeneration/off-gas, drains/vents and utility piping interfaces.

Electrical / Control

Define power, signals, local/package control and plant-control-system battery limits.

Transport / Lifting

Coordinate package dimensions, shipment split, lifting and destination constraints after design development.

Site Support

Installation guidance, commissioning, spares and after-sales support are defined by the agreed project scope.

Project Evidence

What this reference directly proves.

Project identity

Shunbei No. 5 Joint Station molecular-sieve dehydration skid.

Application role

Key natural-gas treatment equipment used for molecular-sieve dehydration.

Verified system elements

Molecular-sieve dryers, regeneration system, dispersing/distribution component and automated control system.

Verified process concept

Molecular-sieve adsorption with regeneration cycling and automated control.

Not Generalized

No project capacity, outlet dew point/moisture value, adsorption cycle, regeneration temperature, efficiency, delivery period or confidential client specification is published as a standard LINSON OIL capability.

Similar Project RFQ

Send the gas analysis, dehydration target and package boundary.

Share gas composition, flow and P/T range, free-liquid/solids condition, required outlet moisture/dew-point basis, regeneration utilities, P&ID, Data Sheets, Technical Specification and battery limits.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

[email protected]
WhatsApp: +86 185 6293 6333
Dongying, Shandong, China

By submitting, you authorize LINSON OIL to contact you regarding this technical inquiry.

Submitting your RFQ...
WhatsApp