LINSON OIL

Natural Gas Dehydration Systems

TEG Gas Dehydration Unit

LINSON OIL supplies project-configured TEG gas dehydration units using triethylene glycol absorption and regeneration circulation. The contactor, glycol circulation and regeneration functions, piping, instruments, controls and package boundary are developed from the gas composition, moisture basis, operating conditions, downstream requirement and project specification.

Engineering Basis
Process data, P&ID and technical specification review
Package Scope
Absorption, regeneration, controls and skid integration
Project Support
Manufacturing, inspection and FAT by project

Customized Supply

Configuration, material selection, instrumentation and auxiliary systems are confirmed against the project basis.

Integrated Package

Designed for equipment supply, skid integration, documentation and site-specific delivery requirements.

Working Principle

Water removal through absorption and controlled regeneration.

Wet natural gas enters the contactor and contacts lean TEG. Water is absorbed from the gas into the glycol phase, while the dehydrated gas leaves for the downstream process. The water-rich glycol is then routed through the project-defined conditioning and regeneration loop before returning to the contactor as lean glycol. Final process design remains subject to confirmed project data.

01

Wet Gas Feed

Inlet conditions, liquid carryover, contaminants and required pretreatment are reviewed before package selection.

02

TEG Absorption

Lean glycol contacts the gas in an absorption column designed around the approved process and mechanical basis.

03

Rich Glycol Handling

Rich glycol can be routed through flash separation, filtration and heat exchange as required by the project scope.

04

Regeneration & Return

Regenerated lean glycol is cooled, conditioned and circulated back to the contactor under controlled operating logic.

Applications

Dehydration packages for gas handling and processing projects.

TEG dehydration is reviewed as one process option within the wider gas-treatment train. Upstream separation, gas composition, moisture requirement, downstream use, utilities, plot limits and control philosophy can all affect the package configuration.

Gas Gathering

For gathering stations and field facilities where water management supports downstream handling and equipment protection.

Gas Treatment Trains

For integration with separation, sweetening, hydrocarbon recovery, stabilization or other project-specific gas treatment steps.

Pipeline & Downstream Gas Conditioning

For gas streams requiring project-defined moisture control before transport or subsequent processing.

Associated Gas & Field Processing

TEG dehydration can be evaluated within associated-gas and field-processing schemes where the required gas condition supports this treatment route.

TEG Circulation & Regeneration

A circulation loop configured for the actual operating envelope.

The glycol loop is engineered as a connected system rather than a collection of standalone components. Circulation conditions, heat exchange, flash handling, filtration, regeneration duty, controls and utility availability are evaluated during technical clarification.

  1. 01

    Lean Glycol to Contactor

    Conditioned lean glycol is delivered to the absorber through a circulation arrangement selected for the confirmed package design.

  2. 02

    Water Absorption from Gas

    Gas-liquid contacting supports moisture removal according to the approved process performance basis and operating conditions.

  3. 03

    Rich Glycol Conditioning

    Flash separation, filtering, heat exchange and other conditioning functions are included where required by the process design.

  4. 04

    Regeneration and Reuse

    The regeneration section removes absorbed water so glycol can return to circulation under the agreed operating and control philosophy.

Illustrative process arrangement only. Final equipment layout, instrumentation, piping and operating sequence are subject to project process data and technical confirmation.

Major Configuration

Package components selected by project requirements.

The following items represent common package functions. Inclusion, sizing, material, controls, vendor preferences and interface limits are confirmed during technical review.

Absorption Section

Contactor, inlet/outlet interfaces, liquid distribution, level control and applicable internals are configured for the approved process basis.

Contactor · Internals · Mist Elimination · Instruments

Rich Glycol Section

Rich-glycol flash handling, filtration, circulation pumping, heat exchange and piping are included where required by the selected process design.

Flash Handling · Filters · Pumps · Heat Exchange

Regeneration Section

Regeneration, heating, vapor handling, cooling and ancillary functions are selected according to the confirmed regeneration philosophy and utility basis.

Regenerator · Heating · Vapor Handling · Controls

Skid, Control & Utilities

Structural skid, piping, valves, instruments, electrical integration, control panel, insulation, access platform and utility interfaces defined by project scope.

Skid · Piping · PLC / Control · Electrical · Utilities

Engineering Inputs

Better technical inputs lead to a clearer package proposal.

If complete information is not yet available, our engineering team can identify the key clarification points needed before finalizing a technical offer. All performance and equipment selections remain subject to review and confirmation.

Send available project documents

PROCESS

Gas & Liquid Conditions

Gas composition, inlet moisture/water basis, hydrocarbon content, contaminants, liquid carryover and required downstream gas condition.

OPERATING BASIS

Operating & Design Cases

Normal/minimum/maximum gas flow, operating and design pressure/temperature, expected operating variation and shutdown philosophy.

INTERFACES

Scope & Battery Limits

P&ID, equipment list, plot plan, fuel/electrical/cooling utility availability, tie-in points, downstream equipment and customer supply responsibilities.

PROJECT CONTROLS

Materials, Codes & Documentation

Material requirements, corrosion considerations, hazardous-area needs, inspection plan, document requirements and destination conditions.

Manufacturing & FAT

Controlled fabrication from drawings to project inspection.

LINSON OIL supports fabrication, piping and skid integration with inspection points aligned to the agreed project documentation and inspection plan. Customer, EPC and third-party inspection coordination can be arranged according to the confirmed scope.

  • Document control: Data sheets, drawings, material records and inspection documentation managed against approved project requirements.
  • Fabrication & assembly: Vessel, piping, structural skid, valves, instruments, electrical and control integration coordinated as applicable.
  • Inspection & testing: Dimensional checks, applicable testing, functional checks and package review performed according to the agreed inspection basis.
  • FAT support: Factory acceptance activities, witness points and records arranged where required by the project specification.

RFQ & Technical Clarification

Send your available data for a project-based review.

Share your RFQ, P&ID, Data Sheet, gas composition, moisture basis, operating conditions or scope notes. Our team will review the information and clarify the technical basis needed for a project-specific TEG dehydration proposal.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

Useful documents

  • Process flow diagram, P&ID or process description
  • Gas composition and moisture-related requirements
  • Operating cases, utility information and site conditions
  • Required scope, documentation and inspection expectations

[email protected]
WhatsApp: +86 18562936333
Dongying, Shandong, China

Accepted examples: RFQ, P&ID, data sheet, process document, drawing or project scope file.

Submitting your inquiry...

Fields marked are required.

WhatsApp