LINSON OIL

Chemical Storage · Metering · Injection · Control

Chemical Injection Skid

LINSON OIL supplies project-configured chemical injection skids for oil, gas, produced-water and field-process duties. Chemical storage, metering pumps, piping, valves, instruments, controls and structural skid integration are selected from the chemical properties, required injection duty, process pressure, site conditions and project specification.

Chemical
Project Defined
Pump Duty
Flow + Pressure Basis
Controls
Project Defined
Inspection
FAT by Project

Project-Configured Dosing Package

Tank, pump, piping, valves, instruments and controls are selected around the actual chemical service and injection point.

Dosing Function & System Logic

Move the specified chemical from storage to the injection point under controlled conditions.

There is no universal pump, tank, material or control arrangement. The final skid depends on chemical compatibility, dosing range, discharge pressure, storage philosophy, redundancy, hazardous-area basis, utilities and client/EPC requirements.

  1. 01 / STORE

    Receive & Store

    Define chemical receiving, storage/day-tank arrangement, fill connection, vent/drain, level monitoring and containment where required.

  2. 02 / METER

    Meter & Pressurize

    Select pump type, number of pumps, suction basis, required injection flow range and discharge pressure from the project duty.

  3. 03 / PROTECT

    Monitor & Safeguard

    Pressure, flow, level, relief, isolation, check-valve and alarm functions are included according to the confirmed operating philosophy.

  4. 04 / INJECT

    Inject & Control

    Route the dosing line to the defined process injection point and coordinate local/remote control, signals and shutdown interfaces.

Applications

Injection skids for process treatment, production support and water systems.

Chemical selection and dosage are process decisions. LINSON OIL’s equipment scope is configured to store, meter and inject the specified chemical safely within the agreed project basis.

01

Oil & Gas Production

Project-specified treatment chemicals for production, gathering and field-process equipment.

02

Separation & Gathering Facilities

Chemical dosing integrated with separators, gathering skids or related process packages where specified.

03

Produced-Water Treatment

Dosing support for project-defined produced-water treatment or reinjection systems.

04

Integrated Process Skids

Standalone or integrated dosing trains coordinated with piping, controls and the wider package battery limits.

Configuration & Supply Boundary

Build the skid around the chemical, pump duty and site interface.

The equipment list below is configurable. Tank size, pump type, number of trains, wetted materials, instrumentation and control architecture are not fixed catalogue values.

Chemical Storage / Day Tank

Tank or storage arrangement, fill, vent, drain, level indication and containment are selected around the specified chemical and refill philosophy.

Metering Pump Package

Pump type, drive, flow range, discharge pressure, duty/standby philosophy and wetted components are project-specific.

Piping, Tubing & Valves

Suction/discharge piping, isolation, check valves, relief arrangements, drains and injection-line interfaces are defined from the service.

Instrumentation & Safeguards

Pressure, flow, level and other monitoring or alarm functions are selected from the control and safeguarding requirements.

Electrical & Control Interface

Local panel, remote signals, control logic, electrical supply and hazardous-area requirements are coordinated to the project basis.

Skid & Structural Integration

Base frame, supports, access, lifting, cable routing, coating, packing and transport provisions are integrated as required.

Engineering Inputs

Chemical compatibility and injection duty drive the design.

Where the basis is incomplete, send the chemical name/SDS and the required injection point information first. Missing pump, tank, material and control inputs can then be clarified before quotation.

Chemical Properties

Chemical name, concentration, SDS, density, viscosity, corrosiveness, solids content and material-compatibility information where available.

Injection Duty

Normal/min/max dosing flow, injection/back pressure, operating schedule, suction condition and number of injection points.

Storage & Redundancy

Required storage duration, refill method, tank capacity basis, number of chemical trains and pump duty/standby philosophy.

Site & Control Basis

Electrical supply, hazardous-area requirement, ambient conditions, local/remote control, plant signals, plot and transport restrictions.

Manufacturing & FAT

Integrate the confirmed dosing equipment into one inspected package.

LINSON OIL coordinates structural skid fabrication, piping/tubing assembly, valves, instruments, electrical/control integration and applicable tank or pressure-retaining items according to the approved scope. Inspection and FAT follow the project specification and ITP.

01

Engineering Release

Approved Data Sheets, P&ID, GA, material basis and inspection points are coordinated before fabrication and assembly.

02

Skid Assembly

Tank, pump package, piping/tubing, valves, instruments and structural items are assembled to the confirmed supply boundary.

03

Inspection & Functional Checks

Material, dimensional, applicable pressure/leak and instrument/control checks are performed as required by scope.

04

FAT & Records

FAT, customer/EPC/third-party witness support and quality records are arranged where included in the project.

Chemical Injection RFQ

Send the chemical service, dosing duty and site basis.

Share the chemical name/SDS, required dosing flow, injection pressure, storage philosophy, P&ID, Data Sheet, Technical Specification or package scope. Our team will clarify the pump, tank, material and control basis before quotation.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

[email protected]
WhatsApp: +86 185 6293 6333
Dongying, Shandong, China

By submitting, you authorize LINSON OIL to contact you regarding this technical inquiry.

Sending your inquiry...
WhatsApp