LINSON OIL supports a controlled quality workflow from incoming material inspection through fabrication, applicable NDT, pressure and functional testing, FAT, pre-shipment inspection and final release documentation.

Inspection methods, witness points, test scope and documentation are defined against the actual equipment, approved ITP, project specification and client requirements.

Inspection Basis ITP & Project Specs
Traceability Material Control
Witness Support Client / EPC / TPI
Release Package Records & Documents

Quality Control Process

CONTROL POINTS FROM MATERIAL RECEIPT TO PROJECT RELEASE.

The inspection plan is coordinated around the actual supply scope, equipment type, design conditions, customer requirements and applicable standards.

01 //

Incoming Material Inspection

Incoming materials and purchased components can be checked against approved specifications and certificates.

02 //

Certificate & Traceability Control

Material identification and certificate verification support traceability through final documentation.

03 //

Welding Control

Welding activities are controlled with applicable procedures, qualified personnel and inspection requirements.

04 //

Dimensional Inspection

Key dimensions, interfaces and fabrication tolerances can be verified against approved drawings.

05 //

Assembly Inspection

Mechanical assembly, piping, valves, instruments and skid integration are checked against scope.

06 //

Coating & Protection Inspection

Surface preparation, coating and marking can be inspected according to project requirements.

Image position: material / dimensional inspection and traceability control
Image position: welding, fabrication and assembly inspection

Inspection & NDT

Applicable methods selected for the project

RT, UT, MT, PT and other inspection methods may be used where applicable, based on equipment design, material, welding scope, code requirements and approved ITP.

RT

Radiographic Testing

UT

Ultrasonic Testing

MT

Magnetic Particle

PT

Penetrant Testing

Image position: radiographic / X-ray inspection capability
Image position: TOFD / phased-array / laboratory inspection resources

Pressure & Functional Testing

Verify performance before release

Test activities are defined according to the equipment type, design conditions, approved documents and project requirements.

Hydrostatic / Pressure Test

Pressure testing may be performed where required by design, code or approved test procedure.

Leak / Tightness Test

Leak, tightness or pneumatic testing can be included where required.

Valve & Instrument Checks

Selected functional verifications can be carried out within the agreed equipment scope.

Electrical & Control Checks

Electrical, instrumentation and control checks can be included in FAT procedures.

Image position: pressure / leak testing where applicable
Image position: assembly / instrument / functional checks
Image position: FAT, final inspection or pre-shipment verification

Factory Acceptance Testing

FAT BUILT AROUND THE APPROVED ITP & PROJECT SCOPE.

FAT content depends on the equipment, package boundary, client specification and approved inspection plan. Customer, EPC and third-party inspection participation can be coordinated when required.

Readiness Review

Confirm the agreed scope, drawings, inspection points and test prerequisites before FAT.

Witness Points

Coordinate customer, EPC or third-party witness / hold points where specified.

Functional Verification

Check applicable mechanical, instrument, electrical and control functions within the agreed package scope.

Final Verification

Review outstanding items, identification, documentation and release status before shipment.

Quality Documentation

Records match the actual project requirements

The final quality file is defined by the equipment type, contract, ITP and client requirements. It may include the records below where applicable.

  • Material: certificates, identification and traceability records.
  • Fabrication: welding / qualification records and dimensional inspection records where required.
  • Testing: applicable NDT, pressure, leak and functional test records.
  • FAT / Inspection: FAT records, witness records, punch-list closure and release documents as specified.
Image position: laboratory / testing resources / quality-record evidence

NDT and laboratory resources, including CNAS-accredited laboratory resources within the manufacturing system, are presented separately on the NDT & Laboratory page. Applicable facility, scope and certification are confirmed by project.

View NDT & Laboratory →

Related Capabilities

Explore the complete delivery system

Quality planning works alongside engineering, manufacturing, integration, delivery and after-sales support.

Discuss Inspection / FAT Requirements

SEND YOUR ITP, TECHNICAL SPECIFICATION OR INSPECTION REQUIREMENTS.

Share your equipment list, data sheet, ITP, inspection requirement or client standard. Our engineering and quality teams can review the requested scope and clarify inspection points, test requirements, witness arrangements and documentation deliverables. Detailed project-specific inspection and FAT documentation is prepared after the equipment scope, technical basis and commercial requirements have been sufficiently clarified.

Upload ITPs, technical specifications, data sheets or inspection requirements.

Specify customer, EPC or third-party inspection requirements.

Request an initial review for customized equipment, skids or project packages.

Inspection Basis

Complete what is available. Unknown items can be clarified during technical review.

Accepted: PDF, Word, Excel, DWG, DXF, JPG or PNG.

Sending requirements...

PROJECT INSPECTION / FAT REQUIREMENTS // LINSON OIL // DONGYING, CHINA

WhatsApp