LINSON OIL

Gas Treatment Equipment

Filter
Separator

Customized filter separator and coalescing-filtration arrangements for natural gas and process-gas streams, used to reduce liquid carryover, solids and entrained contaminants before critical downstream equipment.

Equipment selection and configuration are evaluated against your process data, P&ID, fluid conditions, material requirements, code requirements and installation constraints.

Service Gas Filtration & Coalescing
Supply Mode Equipment or Skid Package
Engineering Basis Project Process Data

Operating Principle

How a Filter Separator Supports a Cleaner Gas Stream

The internal arrangement is selected according to gas composition, liquid loading, solids, carryover risk, maintenance access and downstream protection duty.

STEP 01

Inlet Separation

Inlet flow management helps separate bulk liquid and larger entrained material.

STEP 02

Filtration / Coalescing

Filter or coalescing elements address the specified particle, aerosol and entrainment duty.

STEP 03

Liquid Collection

Separated liquid is collected for controlled drainage or handling.

STEP 04

Gas Outlet

Conditioned gas exits toward downstream treatment equipment.

Applications

Protecting Equipment at Critical Points in the Process

Filter separators can be incorporated into gas gathering, conditioning and treatment systems where liquid carryover, solids or entrained contaminants may affect downstream equipment performance.

Application context: natural-gas treatment / metering / separation package

Natural Gas Treatment

Gas conditioning trains and treatment packages requiring contaminant management.

Metering Protection

Protection for metering equipment requiring a cleaner gas stream.

Dehydration Pretreatment

Pre-treatment ahead of dehydration packages.

Compressor & Downstream Protection

Upstream protection for compressors and process equipment.

Configurations & Supply Forms

Supplier-backed filter & coalescing configurations

The final arrangement is selected according to gas conditions, liquid loading, solids, required filtration / coalescing duty, maintenance access, project code and package boundary. These are configuration routes within the same procurement family, not separate duplicate product pages.

Filter Separator Skid

Separator vessel, connected piping, valves, instruments and structural skid can be integrated into one package where the project scope requires it.

Cyclone Coalescing Filter Skid

Cyclone pre-separation and coalescing / filtration functions can be combined in an integrated skid where the gas-treatment duty calls for this arrangement.

Multiple Coalescing Filter Vessels

Multi-vessel coalescing filtration arrangements are available for applicable project packages; the final vessel count and process arrangement are determined from the project basis.

When the primary procurement duty is sand removal rather than gas filtration / coalescing, review the separate Cyclone Desander product page.

Engineering & Manufacturing Scope

From Process Review to FAT and Delivery

Our engineering and manufacturing teams work from customer process data, P&ID, data sheets and technical specifications to define the filter-separator vessel, internals, filtration / coalescing arrangement, piping, instruments and skid scope.

Gas flow, pressure and temperature
Gas composition and liquid loading
Solids / entrained contaminants
H2S / CO2 and corrosion conditions
Filtration / coalescing duty
Material, code and installation requirements

Request for Quotation

Send Your Process Data

Send available data and documents for a technical review. Our team can evaluate filter-separator configuration, filtration / coalescing duty, engineering scope and project requirements before preparing a quotation. Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

Available Process Data

Complete what is available. Unknown items can be clarified during engineering review.

P&ID, Process Data, Data Sheet, Technical Specification or existing drawing.

Sending RFQ...

Technical documents are accepted for initial engineering review and project clarification.

WhatsApp