Cyclone
Desander

Customized cyclone desander systems for removing sand and heavier solid particles from oil and gas production fluids before they reach downstream separation, piping, valves and treatment equipment.

Final cyclone, vessel, solids-handling and skid arrangements are defined from the actual process data, sand duty, operating conditions and project requirements.

Service Fluid Pretreatment
Supply Mode Unit or Skid Package
Engineering Basis Project Process Data

Operating Principle

How a cyclone desander works

Production fluid enters the desander through a designed inlet arrangement that creates a controlled swirling flow. Centrifugal action moves heavier sand and solid particles toward the outer region of the flow path, where they are directed into a collection or discharge section.

The clarified fluid continues to downstream equipment while the accumulated solids are managed through the selected sand handling arrangement. Final configuration is developed around the actual fluid, solids, operating conditions and project requirements.

  1. 01

    Fluid Inlet

    Well fluid or process fluid enters the cyclone desander assembly.

  2. 02

    Cyclonic Separation

    Rotational flow separates heavier solids from the main fluid stream.

  3. 03

    Collection and Discharge

    Separated solids enter a collection, flushing or discharge arrangement selected for the service.

Flow arrangement and solids collection concept

Project Use Cases

Typical applications

Cyclone desanders can be integrated into production and treatment systems where sand or suspended solid particles may create erosion, deposition, maintenance or reliability risks for downstream equipment.

01

Well Fluid Desanding

Pretreatment of produced fluids from wells where sand production or solids carryover requires evaluation.

02

Separator Pretreatment

Protection for three-phase, two-phase and other separator systems from sand accumulation and erosion concerns.

03

High-Sand Production

Production scenarios requiring an engineered solids-management approach based on available process information.

04

Downstream Protection

Support for reducing solids-related exposure of valves, piping, instruments and fluid treatment equipment.

Supplier evidence position: sand collection / desanding arrangement
Application context: separator / skid equipment protected from sand and solids

Equipment Arrangement

Configured for the project

LINSON OIL can supply cyclone desanders as individual equipment or as part of an integrated skid. The arrangement is reviewed against process conditions, available plot space, operation philosophy, downstream protection objectives and project documentation.

Request Configuration Review

01 / Supply Format

Standalone or Skid-Mounted

Supply may range from a standalone desander vessel or cyclone assembly to a skid with piping, valves, instruments, controls and support structure as required.

02 / Process Arrangement

Project-Specific Cyclone & Vessel Arrangement

The cyclone, pressure-retaining sections and connected process arrangement are defined from the actual flow, pressure, solids duty, maintenance philosophy and project specification.

03 / Solids Handling

Sand Collection and Discharge

Collection, flushing, isolation and discharge arrangements are selected according to operating practice, solids characteristics and site requirements.

04 / Materials

Erosion and Corrosion Review

Pressure-retaining materials, corrosion allowance, erosion-prone areas, coating / lining and other protection measures are reviewed against fluid composition, sand loading, H2S, CO2, salinity and client requirements.

Image position: cyclone-desander skid, piping, valves and instrument integration
Supplier capability position: fabrication, inspection, NDT or pressure testing

Engineering & Manufacturing

From process review to fabrication & FAT

Cyclone desander supply can include the pressure-retaining equipment, cyclone / solids-handling arrangement, connected piping, valves, instruments and skid integration according to the defined project boundary.

  • Pressure-equipment fabrication and dimensional inspection
  • Piping, valves, instruments and skid assembly where required
  • Applicable NDT and material / welding quality control
  • Pressure / leak testing and FAT according to project scope

Technical Clarification

Engineering inputs for RFQ

Desander selection should be based on the actual service. If the information is incomplete, our engineering team can review the available documents and identify the key clarification points before preparing a technical proposal.

Preferred documents: P&ID, Process Data, Data Sheet, Technical Specification, fluid analysis, GA or site layout, and required downstream equipment protection scope.

  • Fluid flow
    Normal, minimum and maximum conditions if available.
  • Pressure and temperature
    Operating and design conditions.
  • Sand concentration
    Expected solids loading or field observations.
  • Particle information
    Particle-size information where available.
  • Fluid properties
    Oil, water, gas and solids characteristics.
  • Corrosive service
    H2S, CO2, salinity and other relevant data.
  • Downstream protection
    Separator, valve, pipeline or treatment equipment scope.
  • Project location
    Site conditions, codes, transport and delivery requirements.

Integrated Project Supply

Coordinate desanding with separation, filtration, skid integration, inspection and FAT requirements.

Request for Quotation

Send your desander RFQ

Send your P&ID, Process Data, Data Sheet or Technical Specification for an engineering review. We can support customized cyclone desander equipment, skid systems and integrated project supply. Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

EMAIL // [email protected]

PHONE / WHATSAPP // +86 18562936333

LOCATION // Dongying, Shandong, China

Available Process Data

Complete what is available. Unknown items can be clarified during engineering review.

Upload P&ID, Process Data, Data Sheet, Technical Specification or related drawings. Accepted file types include PDF, Office documents, images and CAD files.

Sending your RFQ...

Project documents are accepted for initial engineering review and technical clarification.

WhatsApp