LINSON OIL

Gas-Liquid Separation · Liquid Hold-Up · Flare / Relief / Vent Service

Flare Knockout Drum

LINSON OIL supplies project-specific flare knockout drums for removing entrained liquid from flare, relief, blowdown or vent gas before downstream flare handling. Vessel orientation, inlet arrangement, separation internals, liquid hold-up, level instruments, drain or pump-out connections, nozzles, supports, materials, design pressure/temperature, inspection and code basis are confirmed from the actual relief cases and project specification.

Orientation
Horizontal / Vertical
Liquid Hold-Up
Project Defined
Code / Certification
By Project
Inspection
NDT / Pressure Test / FAT

Dedicated Flare-System Pressure Vessel

The drum is engineered from the relief/vent flow, liquid carryover, allowable pressure drop, hold-up requirement, outlet philosophy and mechanical design basis.

Liquid Separation Logic

Reduce liquid carryover before the gas continues to the flare header, stack or downstream venting equipment.

The design should be based on the actual relief, vent or blowdown cases rather than a generic droplet-size or separation-efficiency target. Flow regime, vapor/liquid properties, transient liquid load, allowable pressure drop, required hold-up and drainage philosophy determine the vessel arrangement.

  1. 01 / RECEIVE

    Receive the Relief Stream

    Introduce relief, vent or blowdown flow through the project-selected inlet nozzle and inlet device.

  2. 02 / DISENGAGE

    Reduce Momentum & Disengage Liquid

    Use vessel volume and the selected internal flow path to promote separation of entrained liquid from the gas stream.

  3. 03 / HOLD

    Collect & Hold Liquid

    Provide project-defined liquid hold-up, level monitoring and drain or pump-out connections for the expected liquid load.

  4. 04 / ROUTE

    Route Gas & Liquid Separately

    Send separated gas toward the flare/vent system while collected liquid is routed to the approved drain, recovery or transfer destination.

Applications

A dedicated pressure vessel for liquid control inside flare, relief and vent systems.

This page covers the independently purchased knockout drum. The complete flare system, including stack/tip, ignition, headers and controls, remains on the separate Flare System page.

01

Main Flare Header

Liquid-removal duty upstream of the main flare routing where relief streams may contain condensate, hydrocarbon liquid or water.

02

Relief / Blowdown Service

Transient or emergency relief/blowdown cases requiring temporary liquid separation and hold-up.

03

Vent-System Liquid Knockout

Project-defined vent systems where liquid carryover must be controlled before downstream handling.

04

Modular / Revamp Projects

New or replacement drums integrated with existing headers, drains, pumps, structures, instruments or skid boundaries.

Structure, Internals & Interfaces

Configure the vessel around transient gas flow and liquid-management requirements.

Horizontal or vertical orientation, inlet device, demisting provisions, liquid hold-up, level instruments, drains, pump-out, nozzles, supports, access and materials are project-defined. No fixed performance value is claimed for droplet removal or liquid hold-up.

Shell, Heads & Orientation

Horizontal/vertical arrangement and pressure-boundary geometry are selected from flow behavior, hold-up duty, layout, loads and code basis.

Inlet Device & Separation Internals

Inlet momentum-control and demisting provisions can be included where required by the actual relief stream and downstream protection objective.

Liquid Hold-Up & Level Control

Normal/low/high levels, hold-up volume and level instrumentation are established from the credible liquid load and drainage philosophy.

Drain / Pump-Out Interfaces

Gravity drain, closed drain, recovery, pump-out or other liquid-disposal connections are coordinated to the downstream destination.

Nozzles, Relief & Instruments

Gas inlet/outlet, drain, vent/relief, pressure, temperature, level, sampling and maintenance connections follow the P&ID and vessel Data Sheet.

Supports, Access & Corrosion Basis

Saddles/skirt/legs, access, lifting and materials/coating or corrosion allowance are selected from site, service and project requirements.

Engineering Inputs

Relief cases and transient liquid load define the drum.

Provide the flare/relief P&ID, Data Sheet and relief-case basis where available. Final vessel sizing, internals, liquid hold-up, pressure drop, materials and mechanical design should not be fixed until the operating and mechanical inputs are clarified.

Relief / Vent Flow Cases

Normal/emergency/transient cases, gas/vapor flow, liquid carryover, duration, simultaneous-case basis and inlet pressure/temperature.

Fluid Properties

Gas composition, molecular weight where available, liquid type, density/viscosity, condensate/water/solids, H2S/CO2 and corrosion information.

Hold-Up & Outlet Philosophy

Required liquid hold-up, allowable pressure drop, level philosophy, drain/pump-out route, closed-drain/recovery interface and downstream flare-header conditions.

Mechanical / Inspection Basis

Design P/T, code, materials, corrosion allowance, site loads, nozzle schedule, NDT, pressure test, TPI, ASME U/National Board requirement if applicable, documentation and transport limits.

Manufacturing, NDT & Pressure Testing

Build the vessel to the approved mechanical design and inspection basis.

Manufacturing resources support pressure-vessel fabrication, material traceability, welding controls, dimensional inspection, applicable NDT, hydrostatic/pressure/leak testing, nozzle and internals inspection, coating checks and project-specific FAT/TPI documentation.

ASME U and National Board manufacturing resources may be applied where required and applicable. Formal certificates, registration and code stamping remain subject to the actual manufacturing entity, certificate scope and approved project basis.
01

Material & Traceability

Verify materials, MTCs, identification and traceability according to the approved quality plan.

02

Forming & Welding

Shell/head forming, fit-up, welding and heat-treatment requirements where applicable follow released drawings and procedures.

03

NDT & Pressure Test

Applicable RT/UT/MT/PT and hydrostatic, pressure, leak or tightness tests are performed to the project/code basis.

04

Final Inspection & Records

Nozzle, internals, coating, dimensional, documentation, FAT and TPI checks support final release where included in scope.

Related Solutions & Evidence

Use direct qualification evidence for the product family and broader pressure-equipment evidence for manufacturing.

Solution

Modular Skid Process Packages

Package context when the drum is integrated with drain/pump-out, piping, instruments or controls.

Direct Product-Family Evidence

Flare Knockout Drum Manufacturing Scope

Available qualification material explicitly includes flare knockout drums within the licensed pressure-vessel design/manufacturing scope of the manufacturing resource.

Certification Boundary

ASME U / National Board Resources Where Applicable

Pressure-vessel code resources are applied only where required by the project and only under the actual certificate holder and authorized manufacturing scope.

Flare Knockout Drum RFQ

Send the relief cases, liquid carryover and mechanical design basis.

Share the flare/relief P&ID, relief-case summary, vapor/gas flow, liquid carryover, source and downstream conditions, hold-up or drain philosophy, design pressure/temperature, material/corrosion basis, nozzle schedule, required code and inspection requirements. We will clarify the vessel configuration before quotation.

Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

[email protected]
WhatsApp: +86 185 6293 6333
Dongying, Shandong, China

By submitting, you authorize LINSON OIL to contact you regarding this technical inquiry.

Submitting your RFQ...
WhatsApp