LINSON OIL

Integrated Oilfield Process Solution

Oil-Gas-Water
Separation & Metering

Customized equipment and skid packages for handling multiphase inlet fluids through controlled separation, oil / gas / water outlet management, metering and defined downstream treatment or export interfaces.

The process route, equipment scope, metering philosophy and package boundary are developed from actual P&ID, process data, operating conditions and project requirements—not from a fixed generic package.

Inlet Multiphase Fluid
Separation Oil / Gas / Water
Control Interface & Pressure
Delivery Skid / Package Supply

Process Challenges

Designed around changing field conditions

Separation and metering packages are selected after technical clarification—not from a generic configuration—so the scope can address fluid behavior, operating windows, materials and site interfaces.

01 //

Changing Water Cut

Evaluate liquid handling, interface arrangement, retention requirements and downstream water treatment connection.

02 //

Gas-Liquid Fluctuation

Consider variable gas-oil ratio, pressure behavior, slugging conditions and stable outlet control requirements.

03 //

Sand & Solids

Review solids characteristics, erosion exposure and whether desanding or filtration equipment is required.

04 //

Stable Interface Control

Integrate level, pressure and control-valve arrangements based on operating philosophy and project scope.

05 //

Downstream Metering

Define metering duty, stream condition, meter selection basis, instrument interfaces and required data outputs.

06 //

Corrosive Service

Assess H2S, CO2, produced water, salinity, temperature and material-selection requirements during engineering.

Typical Process

One coordinated flow path. Multiple controlled streams

The final process arrangement depends on your P&ID, process data, operating conditions, equipment scope and the required downstream connections.

STEP 01

Multiphase Inlet

Production fluid enters from wellhead, manifold or upstream gathering source.

STEP 02

Separation

Two-phase or three-phase separation equipment is selected for the duty.

STEP 03

Outlet Control

Oil, gas and water outlets are managed through process instrumentation and valves.

STEP 04

Metering

Metering devices and associated controls are integrated according to project requirements.

STEP 05

Treatment / Export

Separated streams connect to treatment, storage, flare, pipeline or export systems.

Main Equipment Scope

Equipment selected for the process—not a fixed package

Supply scope can cover individual equipment, integrated skids or coordinated project packages.

Three-Phase Separator

For separation duties involving oil, gas and produced water streams, with internals and controls considered against process conditions.

  • ■ Project-specific vessel configuration
  • ■ Process internals and interface arrangement
  • ■ Pressure vessel engineering support

Gas-Liquid Separator

For gas stream conditioning, liquid removal, scrubber duties and related downstream gas handling interfaces.

  • ■ Knockout and scrubber arrangements
  • ■ Drain, vent and relief interfaces
  • ■ Instrument and valve integration

Metering & Test Separator

For test, allocation or process-monitoring duties where separation and metering functions need to be coordinated.

  • ■ Metering duty review
  • ■ Stream routing and isolation
  • ■ Control and data interface options

Metering & Separation Skid

Integrated arrangement for separation, piping, flow measurement, instruments, controls and export connections.

  • ■ Oil, gas and water stream interfaces
  • ■ Meter and control valve coordination
  • ■ Skid-level piping and wiring

Filter Separator / Desander

Optional solids-management equipment where sand, debris, filtration duty or equipment protection needs are identified.

  • ■ Cyclone desanding where required
  • ■ Filtration and maintenance access
  • ■ Erosion and material review

Custom Scope

Need a complete package or one critical unit?

LINSON OIL can support equipment selection, detailed scope clarification, manufacturing and coordinated delivery based on your project documents.

REQUEST TECHNICAL REVIEW

Package Integration

Factory-integrated for clearer site interfaces

A separation and metering package can be supplied as a coordinated skid scope to reduce interface gaps between mechanical equipment, piping, instruments, controls and electrical systems.

Mechanical

Vessels, piping, valves, supports, drains, vents, lifting points and skid structure.

Instrumentation

Level, pressure, temperature, flow and instrument connection scope as required.

Control

Control valves, control panels, alarm requirements and signal interfaces according to the defined project scope.

Electrical

Cabling, junction boxes, local equipment and electrical integration according to defined scope.

Integrated Scope May Include

Process piping, valves, flowmeters, pressure and level instruments, control components, electrical interfaces, skid steelwork, inspection points, documentation and export packing.

Project evidence position: separator skid, metering integration, fabrication, FAT or delivery

Project & Execution Evidence

From separator skid to integrated project scope

Relevant project experience includes separator skids where oil, gas and water separation, metering interfaces, piping, valves and factory preassembly are coordinated as one project scope.

Engineering & Quality Support

Start with the right technical inputs

Our engineering team reviews the available project information to clarify equipment duty, scope boundaries, materials, instrumentation, testing and document requirements before quotation.

01

Engineering Documents

P&ID, Process Data, Equipment List, Datasheets and Technical Specification.

02

Design Clarification

Flow rates, water cut, pressure, temperature, fluid properties, sand and corrosive components.

03

Quality & FAT Planning

Material traceability, NDT, pressure testing, inspection points, FAT records and project documentation.

Useful RFQ information

Incomplete data is acceptable. Send what you have, and identify any assumptions or open technical questions.

Process

Oil, gas and water flow rates; water cut; gas-oil ratio; operating pressure and temperature.

Fluid Properties

Density, viscosity, composition, sand / solids, H2S, CO2, salinity and corrosive-service information.

Metering & Controls

Metering requirement, instrument preference, control philosophy, hazardous-area and communication needs.

Project Conditions

Project location, applicable codes, site layout, transport limits, inspection requirements and delivery target.

Technical RFQ

Send your process challenge

Share your P&ID, process data, datasheet, equipment list or technical specification. LINSON OIL will review the available information and respond with clarification questions or a proposed scope direction. Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.

Direct Contact

LINSON OIL

[email protected] +86 18562936333

Dongying, Shandong, China

Available Process Data

Complete what is available. Unknown items may be clarified during engineering review.

Recommended: P&ID, Process Data, Equipment List, Datasheets, Technical Specification, layout drawing or existing equipment photos.

Your information is used for technical review and RFQ communication.

Sending technical inquiry...
WhatsApp