LNG Process Packages & Supporting Equipment
LNG packages shaped around your project route.
LINSON OIL supplies project-defined LNG-related process packages and supporting equipment for gas conditioning, pretreatment, dehydration, mercury removal where required, liquefaction-section interfaces, product handling and utility integration. The selected liquefaction technology and process route follow the client, EPC, licensor or project technical basis rather than a fixed proprietary LINSON process.
- Supply Focus
- Equipment, skids & package interfaces
- Technical Basis
- Client / EPC / licensor process route
- Inspection
- Inspection & FAT by project
Project-Based LNG Processing Logic
Define the technology route first, then define LINSON OIL’s package boundary.
LINSON OIL does not present one fixed proprietary LNG liquefaction process. Pretreatment, dehydration, mercury removal, refrigeration/liquefaction interfaces, product handling and utilities are coordinated against the process scheme and technical requirements supplied by the client, EPC, licensor or project engineering basis.
Feed Gas Review
Confirm gas composition, flow, pressure, temperature, liquids, water and known contaminants.
Pretreatment Basis
Define separation, filtration, sweetening, dehydration or mercury-removal requirements only where specified by the selected process route.
Liquefaction Interface
Confirm the refrigeration/liquefaction technology basis, process interfaces and equipment responsibility split.
Product Handling
Coordinate LNG-related transfer, storage, metering, loading and downstream interfaces where included in scope.
Utilities & Controls
Define electrical, instrument, control, safety and utility interfaces together with the package battery limits.
Applications
LNG-related packages for field, terminal and associated-gas projects.
The final package depends on the project process route and battery limits. LINSON OIL may supply selected equipment, integrated skids or supporting modules rather than the entire liquefaction plant.
Associated-Gas Utilization
LNG-related treatment and package interfaces within associated-gas recovery and utilization projects.
Oilfield Terminal Gas Processing
Gas-treatment and LNG-related equipment integrated with terminal processing where defined by the project scheme.
Gas Pretreatment Packages
Separation, dehydration, mercury removal or other pretreatment sections supplied where required by the downstream LNG process.
Modular Project Packages
Skid-mounted vessels, piping, instruments, controls and supporting modules within an agreed project boundary.
Main Systems & Interfaces
Configure the package around the approved process route and battery limits.
Not every LNG project includes the same equipment. Each section below is included only when required by the process scheme and confirmed commercial scope.
Feed Reception & Inlet Conditioning
Inlet separation, filtration, pressure-control or compression interfaces where defined by the feed basis.
Gas Treatment & Dehydration
Sweetening, molecular-sieve or other specified dehydration treatment according to the approved process design.
Mercury Removal
Mercury-removal vessels or guard systems where mercury control is identified in the gas analysis and downstream specification.
Liquefaction & Refrigeration Interfaces
Pressure equipment, piping, heat-transfer and auxiliary interfaces supplied according to the selected technology and responsibility split.
Product & Storage Interfaces
Transfer, metering, loading or storage connections where included within the agreed package boundary.
Utilities, Instrumentation & Control
Electrical, instrument, control, shutdown, safety and utility interfaces coordinated to the project specification.
Engineering Inputs
Start with the approved process basis and interface responsibilities.
If the project is still in clarification, send the information already available. The missing inputs can then be identified before quotation and detailed technical submission.
Feed Gas Data
Gas flow, composition, water, H2S/CO2, mercury where relevant, hydrocarbon liquids, pressure and temperature.
LNG Process Basis
Client/EPC/licensor process route, PFD/P&ID, required LNG/product basis and defined process guarantees.
Utilities & Site Conditions
Electrical supply, heating/cooling utilities, ambient/site conditions, hazardous-area basis and plot restrictions.
Scope & Interfaces
Equipment list, battery limits, customer-supplied items, inspection requirements, transport limits and documentation scope.
Manufacturing & FAT
Manufacture and integrate the confirmed equipment scope.
LINSON OIL coordinates pressure equipment, piping, skid modules, instruments and controls within the confirmed LNG-related supply boundary. Inspection and FAT follow the applicable project specification and ITP.
Engineering Release
Approved equipment data, drawings, materials, interfaces and inspection points are coordinated before fabrication.
Fabrication & Skid Integration
Applicable vessels, piping, valves, instruments, electrical items and structural modules are fabricated and assembled to scope.
Inspection & Testing
Material control, dimensional inspection, applicable NDT, pressure/leak and instrument/control checks are performed as required.
FAT & Records
FAT, customer/EPC/third-party witness support and quality records are arranged where included in the project scope.
Related Equipment
Connect the LNG package to the required pretreatment equipment.
Molecular Sieve Gas Dehydration Unit
Deep dehydration route where required by the selected downstream LNG process.
View Equipment →Dehydration & Mercury Removal Package
Project-specific pretreatment where both moisture and mercury control are required.
View Equipment →Gas Sweetening / Desulfurization Unit
Acid-gas or sulfur treatment where identified by gas analysis and project specification.
View Equipment →Process Heat Exchanger
Project-defined heating, cooling or heat-recovery duties within the wider process train.
View Equipment →Related Solutions & Projects
Use process context and project evidence together.
Solution
Associated Gas Recovery & Utilization
Connect gas conditioning, recovery, NGL/LNG-related processing and downstream utilization.
Solution
Natural Gas Dehydration & Treatment
Coordinate inlet conditioning, dehydration and specified contaminant treatment before downstream processing.
Solution
Modular Skid Process Packages
Integrate pressure equipment, piping, instruments and controls within a defined module boundary.
Project Reference
Congo Associated Gas / NGL / LNG Project
Documented associated-gas recovery, light-hydrocarbon recovery and LNG-related project experience.
Project Reference
Wushi Oilfield Equipment Project
Oilfield terminal project experience with natural-gas/LNG-related processing functions.
Start Technical Clarification
Send your LNG-related RFQ and available project data.
Share the feed-gas basis, client/EPC/licensor process route, PFD/P&ID, equipment list, Data Sheets, Technical Specification and required LINSON OIL supply boundary. Our team will review the interfaces before confirming a project-specific scope.
Detailed datasheets, drawings and project-specific technical documents are prepared after the operating conditions, scope of supply and commercial basis have been sufficiently clarified.