One Focused Industry

Petroleum Equipment Built for the Field.
Engineered for the Application.
Proven in Operation.

LINSON OIL doesn't make general industrial equipment. Everything we manufacture is purpose-built for oil and gas — upstream production, gas processing, terminal operations, and EPC project supply. 21+ years. 5,000+ projects.

Oilfield Wellsite Operation
Upstream Production
Gas Processing Terminal
Gas Processing
Pipeline Terminal Facility
Terminal Ops
Upstream oil and gas production facility

Upstream Oil & Gas Production

What This Covers

Wellhead production, gathering stations, single-well and multi-well pad operations, oil/gas/water separation, produced water handling, crude oil dehydration, and well-site metering.

The Challenge

Upstream equipment operates continuously in harsh field conditions — high water cut, sand, fluctuating inlet pressure, remote locations. Equipment failure means production downtime. Buyers need reliable, field-proven equipment with minimal maintenance and fast deployment.

Reference Project

Xianhe Oilfield — He50 Well Area

Three-Phase Separator Skid Package — modular oil/gas/water separation with integrated metering and export. Fully factory pre-fabricated for rapid site installation.

What LINSON OIL Supplies

Separation Systems

  • Three-Phase Separator Skids: Oil/gas/water separation; cyclone inlet removes 90%+ associated gas; 316L corrugated plate coalescers; wire mesh demisters (5μm); automated sand removal; float-ball level control. Design life ≥10 years. Corrosion allowance 3mm standard.
  • Two-Phase Separators (vertical & horizontal): Wellhead and gathering station use. Handles fluctuating inlet conditions.
  • Gas Manifold / Knockout Drums: Gas distribution, liquid knockout, pressure regulation.

Heating Solutions

  • Water Bath Heaters: Indirect heating; stable for continuous field operation.
  • Vacuum Phase-Change: Thermal efficiency ≥90%. Split-body design.
  • Ex-Proof Electromagnetic: Efficiency ≥98%. ExdbIICT4 Gb. No open flame.
  • Electric Heating: Pipeline/tank tracing for high pour-point crude.

Modular Site Solutions

  • Multi-Function Collectors: Integrates separation, heating, metering, loading. Off-grid capable.
  • Wellhead Valve Skids: Manifold assemblies for multi-well pads.
  • Elevated Storage Tanks: 40m³ standard with heating options.
  • Field Camp Houses: Relocatable harsh-environment living quarters.

Full-Chain Integrated Supply Scope

Stage 1

Gas-Liquid Separation at Wellhead

Gas-Liquid Separators / Buffer Separators. Three-Phase Separator Skids (oil/gas/water at source).

Stage 2

Gas Gathering & Compression

Gas Manifold / Knockout Drums. Pig Launcher / Receiver Skids (pipeline integrity maintenance).

Stage 3

Gas Dehydration

Molecular Sieve Dryers Deep dehydration to pipeline spec and LNG feed spec. Twin-tower adsorption-regeneration cycling. Automatic control with online dew point monitoring.
Stage 4

NGL Recovery & Stabilization

Condensate Stabilization ColumnsRectification + stripping. Light component removal; NGL stabilization.
Packed TowersAbsorption, stripping, NGL stabilization; structured and random packing options.
Stage 5

LNG / LPG Production

Gas Processing Skids: NGL recovery, LNG liquefaction, associated gas utilization. Products: propane, butane, stable light hydrocarbons, LNG.

Stage 6

Heating & Integration

Vacuum Phase-Change Heaters / Water Bath Heaters. Complete associated gas recovery skid packages — process design through FAT, single-source supply.

Associated gas recovery and LNG processing facility
Congo Jiarou — Associated Gas & LNG

Associated Gas Recovery & Utilization

What This Covers

Capture and processing of associated gas produced alongside crude oil. Applications: flare elimination, gas-to-power, NGL extraction, LNG production, fuel gas supply, and carbon reduction compliance.

Why This Matters Now

Flaring regulations are tightening globally. Associated gas that was previously flared now represents both a regulatory liability and a recoverable revenue stream.

The Challenge

Associated gas recovery requires a full process chain — separation, compression, dehydration, NGL extraction, LNG liquefaction. Few manufacturers can supply the complete integrated system.

2024 First-of-its-Kind Equipment

Associated Gas Intelligent Recovery & Utilization System

Shandong Province First-of-its-Kind Equipment designation.

Reference Project

Congo (Brazzaville) — Jiarou Oilfield

  • Phase I: 100×10⁴ Nm³/d NGL recovery
  • Phase II: 200×10⁴ Nm³/d gas + 100×10⁴ Nm³/d LNG
  • Phase III: 100×10⁴ Nm³/d gas + 100×10⁴ Nm³/d LNG

Full international delivery and commissioning support.

Discuss Gas Recovery Project
NGL / LNG / LPG processing facility
NGL / LNG / LPG Processing

NGL / LNG / LPG Processing

What This Covers

Natural gas liquids extraction, liquefied natural gas production, liquefied petroleum gas recovery, condensate stabilization, and gas-to-product processing for commercial sale or fuel supply.

The Challenge

NGL/LNG/LPG processing requires precise process engineering — feed gas composition analysis, phase equilibrium design, column sizing. Equipment must be engineered to the specific feed gas composition and target product specification. Off-the-shelf products don't work here.

Reference Projects

Sinopec Northeast Bureau — Longfengshan

Condensate Stabilization Unit (Rectification + stripping; light component removal).

Sinopec Northwest Bureau — Shunbei No.5

Molecular Sieve Dehydration Skid (deep dehydration for Ordovician reservoir gas).

Submit Feed Gas Data

Core Processing Equipment & Engineering

Condensate Stabilization Columns

Rectification + stripping process. Removes light components (C1, C2) from unstabilized condensate. Produces stabilized condensate meeting RVP spec for storage/transport.

Feed: from metering & production separators

Packed Towers

Absorption and stripping for NGL extraction. Structured packing (high efficiency, low pressure drop) and random packing options. NGL stabilization service.

Molecular Sieve Dryers

Feed gas dehydration before cryogenic or refrigeration processing. Achieves pipeline spec and LNG feed gas water dew point. Modular twin-tower design with automatic regeneration cycling.

Gas Processing Skids

NGL recovery skids, LNG liquefaction skids, LPG recovery and fractionation skids. Associated gas utilization and compression integration.

In-House Engineering Capability

Process design from feed gas composition data · Heat and material balance calculations · P&ID development and equipment sizing · Full skid integration from process design to FAT.

Offshore and onshore terminal processing facility

Offshore & Onshore Terminal Processing

Onshore receiving terminals for offshore production. Crude oil stabilization, dehydration, desalting, and export. Gas processing, mercury removal, and product separation at centralized processing facilities.

The Challenge

Terminal processing handles mixed feed from multiple wells or platforms — variable composition, high water cut, potential contaminants (mercury, H₂S, CO₂, sand). Equipment must handle the full range of inlet conditions and meet strict export product specifications. Terminal downtime affects the entire upstream production chain.

Separation & Processing

  • Three-Phase Separators: High water-cut/GOR, automated sand removal.
  • Packed Towers: Gas sweetening and NGL stabilization.
  • Molecular Sieve Dryers: Deep dehydration for export/LNG feed.
  • Desalting Modules: Electric desalting + three-phase separation.

Storage & Heating

  • Fixed Pressure Vessels: A2 + High-Pressure, GB 150 compliant.
  • Storage Tanks: Atmospheric & Elevated with heating options.
  • Terminal Heating: Vacuum Phase-Change & Ex-Proof Electromagnetic.
Discuss Terminal Requirements
Flagship Reference Project

CNOOC Wushi Oilfield

Onshore Terminal Facility

Scope

Processes water-cut crude oil and natural gas from offshore oilfields. Crude oil dehydration, gas stabilization, LNG liquefaction, LPG recovery, and mercury removal.

Key Equipment Supplied

Dehydration & Demercurization Skid

🏆

Awarded 2025

Shandong Province First-of-its-Kind Equipment designation.

EPC project procurement and international delivery

EPC & Project Contracting

EPC contractors procuring petroleum equipment for project scopes. Engineering firms sourcing separation vessels, heating systems, pressure vessels, and skid packages as part of a larger project BOM.

The Challenge EPC Buyers Face

You're managing a project BOM with 20–50 line items. You need multiple equipment types from one or more vendors. Delivery schedules must align with your project timeline. Vendor qualification takes time — and you can't afford to qualify five separate manufacturers.

Submit Project BOM

Single-Source Supply

Separation equipment + heating systems + pressure vessels + skid packages — all from one manufacturer. One vendor qualification. One documentation package. One point of contact.

Qualification Credentials

  • Special Equipment Mfg License (A2 + High-Pressure)
  • Pressure Piping Components License (GC2)
  • CNAS Accredited Lab · ISO 9001/14001/45001
  • Sinopec & CNPC HSE Certified Supplier

Full Documentation per Project Requirement

• Pressure vessel certification (GB/ASME)
• Material traceability (mill certs)
• Weld inspection records (RT/UT/MT/PT)
• NDT reports from in-house lab
• Pressure test & Instrument calibration
• O&M manuals & Packing lists
EPC Reference: Sinopec Northwest Bureau No.5 Joint Station Heating furnace supply — consecutive Top 10 Excellent Supplier award 2020 & 2021. Multi-year supply program demonstrating schedule reliability and quality consistency.

One Manufacturer. Every Upstream Application.

21+ Years
Oil & gas focus
5,000+
Projects Delivered
87
Patents
30,000
Factory Base
CNOOC / Sinopec
Qualified Supplier
2×
First-of-its-Kind

Standard 2-Year Warranty

Double the industry average. Long-term partners: up to 2.5 years. We stand behind what we build.

No Core Subcontracting

Every piece of equipment is engineered, fabricated, tested, and documented at our own facility in Dongying, Shandong. You know exactly where your equipment comes from.

Tell Us Your Application.
We'll Tell You Exactly What We Can Build.

Select how you'd like to proceed below.

A

I have a specific project

Send us your process parameters or project brief. Our engineers will review and respond within 24 hours.

Submit Application Inquiry
B

I need to verify capabilities

Request our product catalog, credential package, and relevant project references for your industry.

Request via WhatsApp
C

I want to see all products

Browse our complete product lines across Separation, Heating, Pressure Vessels, and Skids.

View All Products

Free Application Review

Share your process conditions or project description. Our engineering team will provide a preliminary equipment recommendation — no charge, no obligation.

Dongying, Shandong, China