LINSON OIL // Dongying, China
SKID-MOUNTED SEPARATOR SYSTEMS FOR OIL & GAS PROCESSING.
More than a separator on a base frame. LINSON OIL engineers coordinated separator packages that can integrate the vessel, piping, valves, instruments, controls and skid structure, with factory assembly, documentation and verification aligned to the agreed project scope.
- Design Basis
- Package Scope
- Interfaces
- Verification
System Scope
THE SEPARATOR IS THE PROCESS CORE. THE SKID IS THE DELIVERABLE.
Scope is coordinated around the operating duty, project interfaces and battery limits—not around isolated equipment supply.
Separator Vessel
Process vessel, internals and nozzles configured around the defined separation duty and operating conditions.
Process Piping
Interconnecting piping, fittings, drains, vents and supports installed to match the defined interfaces.
Valves & Instruments
Specified valves, transmitters, gauges, level devices and safety accessories supplied as a coordinated scope.
Controls & E&I
Control panel, electrical integration, field cabling and control philosophy aligned with the project requirement.
Skid Structure
Structural base, equipment supports, lifting considerations and transport-ready arrangement for field deployment.
Why Skid-Mounted
MOVE COMPLEXITY INTO A CONTROLLED FACTORY ENVIRONMENT.
A skid package consolidates process equipment and multiple disciplines into a coordinated unit before it reaches site. This can reduce field interfaces and shift more assembly and verification work into a controlled factory environment.
Factory Integration
Fabrication, piping, instrumentation, electrical work and equipment arrangement are coordinated under one manufacturing plan.
Reduced Site Work
A preassembled package can reduce site fabrication, fragmented procurement and time spent coordinating separate contractors.
Clear Interface Coordination
Tie-in points, utility connections, control boundaries and battery limits are identified early in the engineering process.
FAT Before Shipment
Inspection, pressure testing, instrument checks and agreed functional verification can be completed before export packing where included in the project scope.
Package Principle
Configuration Overview
SELECT THE PROCESS FUNCTION. ENGINEER THE COMPLETE PACKAGE.
These are starting points for technical discussion--not off-the-shelf catalog packages.
01 // PROCESS DUTY
Three-Phase
Oil, gas and water separation with vessel internals, level control and discharge arrangement matched to duty.
View Product →02 // PROCESS DUTY
Two-Phase
Gas-liquid separation for production, gathering and treatment applications with liquid handling configured to the project duty.
View Product →03 // PROCESS DUTY
Gas-Liquid
Gas-liquid separation duties configured around liquid loading, pressure, flow, outlet condition and downstream protection requirements.
View Product →04 // PROCESS DUTY
Metering-Test
Well test and production measurement packages integrating separation, metering and field connection requirements.
View Product →05 // PROCESS DUTY
Filter Separator
Filtration and separation systems with element access, drainage, instrumentation and maintainability considered according to project scope.
View Product →06 // PROCESS DUTY
Cyclone Separator
Cyclonic pre-separation or selected primary-separation duty for suitable liquid- or solids-bearing process streams.
View Product →Engineering Inputs & Battery Limits
DEFINE THE PACKAGE BOUNDARY BEFORE FABRICATION BEGINS.
Better package definition supports accurate equipment selection, transparent quotation scope and smoother project execution. Our engineering team reviews the information available and identifies technical clarifications early.
Process Data
Flow rate, pressure, temperature, fluid composition, water cut, gas-oil ratio, solids, H₂S, CO₂ and corrosion considerations.
P&ID & Duty
Available P&IDs, process descriptions, performance requirements, equipment data sheets and preferred operating philosophy.
Utilities & Tie-Ins
Power supply, instrument air, nitrogen, fuel, drains, inlet and outlet connections, flange standards and site interface details.
Hazardous Area
Area classification, electrical protection requirements, destination-market standards and project-specific compliance needs.
Layout & Access
Footprint, maintenance access, elevation, platform requirements, lifting points, operator access and installation constraints.
Transport Limits
Road, port, lifting, module dimensions, shipping route and export packing requirements that affect skid arrangement.
Multidisciplinary Integration
ONE PROJECT TEAM ACROSS THE CRITICAL DISCIPLINES.
Integrated packages work when disciplines are coordinated around the same process duty, interfaces, layout and delivery objective.
Mechanical
Vessel design, materials, nozzle arrangement, supports and pressure-containing equipment details.
Piping
Pipe routing, supports, valves, fittings, drains, vents and tie-in locations coordinated with the package layout.
Instrumentation
Measurement, control valves, field instruments, alarm points and process protection requirements.
Electrical
Power distribution, motors, junction boxes, cable routing and hazardous-area execution where required.
Control
PLC or local control scope, control narratives, communication interfaces and operational logic.
Structure
Skid base, lifting provisions, equipment supports, access steelwork and transport considerations developed to project requirements.
Manufacturing, Assembly & FAT
INTEGRATION IS VERIFIED BEFORE THE PACKAGE LEAVES THE FACTORY.
LINSON OIL operates its own manufacturing base for pressure-vessel fabrication, assembly, testing and skid integration. Where applicable, pressure-vessel work is executed within the relevant A2 qualification scope and project quality requirements.
Controlled Execution Checklist
Fabrication & Assembly
Cutting, rolling, welding, machining, vessel fabrication, piping installation, instrument mounting and skid integration.
Inspection & Testing
Material verification, dimensional inspection, NDT, pressure testing, leak checks, electrical and instrumentation checks as applicable.
Factory Acceptance Test
Agreed FAT activities support confirmation of assembled scope, functionality, documentation status and shipment readiness.
Project Documentation
Drawings, data sheets, certificates, inspection reports, FAT records, manuals and export packing documentation managed to project scope.
Project Evidence // Xianhe He50
Project Evidence
XIANHE HE50: SEPARATION, METERING & RAPID INSTALLATION IN ONE INTEGRATED PACKAGE.
The Xianhe He50 project provides a relevant reference for skid-mounted delivery. The integrated three-phase separator package combines separation and metering functions in a factory-prefabricated arrangement intended to support coordinated field installation.
- Core Function
- Integrated Scope
- Deployment Goal
Related Solutions
EXPAND FROM A SEPARATOR SKID TO A COMPLETE PROCESS SOLUTION.
Related Solution
Well Testing & Production Separation
Integrated packages for well test duties, production separation, measurement and field connection requirements.
Related Solution
Oil, Gas & Water Separation
Process packages for multiphase treatment, fluid separation and project-specific downstream handling requirements.
Related Solution
Custom Skid-Mounted Process Packages
Custom-engineered processing, heating, dehydration, stabilization and integrated oilfield package solutions.
Procurement FAQ
QUESTIONS BEFORE PACKAGE DEFINITION.
A clear battery limit and process basis help prevent scope gaps between the separator, piping, instruments, controls and site interfaces.
What can be included in a skid-mounted separator package?
What information should we send for quotation?
Can LINSON OIL work from an EPC or owner P&ID?
Is FAT included with every package?
RFQ / Technical Clarification
LET'S DEFINE YOUR SKID PACKAGE.
Send your P&ID, process data, equipment list, data sheet or preliminary requirement. Our team can review the package scope, identify key clarifications and prepare a technically aligned proposal.
Discuss on WhatsApp